NYC Kitchen Electrical Upgrade Requirements 2026: Induction Power Loads, Subpanel Limits, and Wet-Over-Dry Restrictions
- Richard Golding
- 17 hours ago
- 3 min read

Why NYC Kitchens Need Electrical Upgrades in 2026
NYC’s move toward electrification, combined with aging prewar infrastructure, means more homeowners swapping gas for induction. Induction ranges often require 40–50 amp dedicated circuits, which older apartments lack.
Most UWS, Harlem, Park Slope, SoHo, and Brooklyn Heights apartments still run:
60–80 amp main service
Overloaded 120V circuits
No true dedicated appliance lines
Cloth wiring behind plaster
This makes electrical modernization a core part of kitchen remodeling.
What Induction Cooking Requires in NYC Apartments
Electrical load requirements
NYC induction ranges typically require:
240V
40–50 amp breaker
6/3 copper wiring
Dedicated circuit
This circuit alone often exceeds the capacity of older main panels.
Co-op board concerns
Boards are wary of heat loads, riser capacity, and breaker failures. Many now mandate:
Proof of load calculations
Electrician letter of capacity
Panel diagram submissions
Some buildings restrict total power draw during peak winter months.
DOB filing triggers
ANY of the following typically triggers an electrical filing:
Increasing breaker size
Adding circuits
Installing 240V lines
Adding subpanels
Relocating appliances
Subpanel Requirements in NYC Kitchens
Adding a subpanel is common when the existing panel cannot accommodate modern demands.
Typical NYC kitchen subpanel loads:
Range: 40–50 amps
Dishwasher: 15 amps
Microwave: 20 amps
Refrigerator: 15 amps
Lighting + outlets: 15–20 amps
Co-op considerations
Some buildings restrict subpanels in closets or hallways. Others require fire-rated enclosures.
Cost ranges (NYC average):
Subpanel install: $1,800–$4,200
New dedicated lines: $350–$650 per circuit
Full panel upgrade: $2,500–$6,500
Con Edison service upgrade: $5,000–$15,000+
Wet-Over-Dry Restrictions and Electrical Layouts
Wet-over-dry refers to whether you can place wet functions (sink, dishwasher, refrigerator with icemaker) over a neighbor’s dry spaces (living room, bedroom).
Why this matters for electrical upgrades
If the co-op restricts relocating appliances, you cannot move:
Dishwasher circuits
Refrigerator outlet
Microwave power
Range location
This locks in your appliance map and determines:
Where electrical circuits must run
Whether conduit must be surface-mounted or fished
Whether new wiring demands plaster demo
Buildings with strict wet-over-dry enforcement include:
UES co-ops
Brooklyn Heights prewar buildings
Park Slope brownstones with cut-up floorplates
Riverdale mid-century co-ops

Timeline for NYC Kitchen Electrical Upgrades
1. Design + Load Calculations (1–2 weeks)
Electrician and GC calculate total appliance load.
2. Co-op Board Review (2–6 weeks)
Board architect evaluates circuit count and riser capacity.
3. DOB Filing (2–5 weeks)
Electrical Plan Examination + objections.
4. Con Edison Coordination (2–8 weeks)
Only for service upgrades. Winter is slower.
5. Construction (1–2 weeks)
Demolition, wiring, subpanel installation.
NYC Electrical Upgrade Costs in 2026
Upgrade | Cost |
240V induction circuit | $900–$2,200 |
New kitchen circuits | $350–$650 each |
Subpanel install | $1,800–$4,200 |
Full panel upgrade | $2,500–$6,500 |
Con Edison service upgrade | $5,000–$15,000+ |
Plaster repair | $600–$2,000 |

How to Choose the Right NYC Contractor
Choose a GC who:
Handles co-op electrical filings regularly
Understands riser limitations
Has reliable electricians approved by NYC buildings
Navigates DOB and Con Edison delays
Metro Contractors specializes in complex NYC kitchen upgrades.
👉 Book a consultation: https://www.metrocontractors.nyc/book-online👉 View past NYC projects: https://www.metrocontractors.nyc/gallery
FAQ
Do I always need DOB permits for electrical work?
Yes if you add circuits, change breaker sizes, install 240V, or add a subpanel.
Can every NYC apartment support induction?
No — many require panel upgrades or Con Edison service increases.
What if my co-op rejects wet-over-dry changes?
You’ll need to keep appliance locations where they are and adjust electrical planning.